Canon Barnett Primary
School

The design
will improve access
and security by providing a new
entrance to the
front of the school with street presence,
which is
currently lacking. The
reception and
administration areas are presently on the second floor at
the rear of the building which is inefficient for the school’s
operation, so these will be
brought to the ground floor at the new
entrance. The design intent is to rationalise the
school's operation by the
improvement of circulation and facilities as
well as enlarging spaces to enhance the school
environment.
The new design incorporates:
- A new
extension to provide a reception area on the ground floor.
- Internal alterations to form a
new waiting area, administration office and
a headteacher's room at the new
entrance.
- A new entrance path and associated
landscaping to the front of the school.
- A new bicycle storage area accessible to all
visitors.
- A small extension at the rear of the building to
turn one existing classroom into two with
independent WC
facilities.
- New WC
facilities accessible from the playground.
- A new DDA compliant lift to allow
wheelchair users to access three
levels of the existing building.
The existing building facades are predominantly typical
1900’s structure with yellow London stock brick. The design will complement
the existing building in terms of materials and style.
The project is currently in design and
documentation stages and construction will commence in
2011.