Globe Primary School
Existing school
building
Proposed extension

The school is located within the Globe Road Conservation
Area, on the corner of Globe Road and Gawber Street, and
was built in 1874. In many ways the three-storey, Victorian brick
building lacked the flexibility, space, circulation and access
expected in modern-day schools. Following
consultation with the school’s senior leadership,
an overall scope of works was developed. The design
enhances learning environments and adds the
flexibility and improved layouts required for the school's optimal
operation.
The works include:
- A two storey extension with refurbishment and
reconfiguration of the internal areas to form a new reception
classroom and staff preparation room with an accessible science
garden on the floor above.
- New level entrance to provide direct access to
new secure entrance lobby.
- Relocated reception and administration
spaces on the ground floor adjacent to
the main entrance.
- New headteacher and deputy head's rooms within
a central area of the ground floor.
- Library relocated to the mezzanine level near
the ground floor.
- New lift.
- Alterations to classrooms to form a new hall
with performance space.
- New WC facilities.
- New hygiene, reprographics, multi-purpose and
library/ reading rooms.
Whilst the building has no formal conservation listing, it does
have elements of brick detailing of historical
architectural significance. The extension was designed to
appear to be part of the original building with materials and
detailing to match the existing building.
The new extension is located over an area previously occupied by
a single storey nursery toilet facility so that direct access will
now be provided onto the nursery playground from
the classrooms. This extension will provide a valuable
preparation space for the staff, improved open
plan area for the reception and nursery classrooms with
direct access to the play ground and an outdoor science
garden on the roof of the extension.
Extensive alterations and refurbishments are proposed for all
levels to provide larger and more flexible spaces
as well as installation of a lift to provide access.
As the proposals include extensive alterations and
refurbishments throughout the school, works are being progressed in
sections to ensure the works can be safely completed while the
school is fully occupied. The works are currently under
construction and are due for completion early in
2011.