Alterations to a Single Non-Domestic Building
The charges for Building Regulation work cover the cost of the service provided. We have set the charges on the basis that:
If this is not the case, we might need to charge more. This is because of extra work needed to check your plans and compliance.
There are two methods of establishing the charge for building work:
-
Individually determined charges and
2. Standard charges.
The charges for alterations to a single non-domestic building are standard charges listed in table D.
If your building work is not listed as a standard charge on this page it will be individually determined.
You should e-mail Building Control at: buildingcontrol@towerhamlets.gov.uk. We will contact you in 1 working day.
Table D
Alterations to a Single Non-Domestic Building
Regularisation Charge = 1.25 x [Plan Charge + Inspection Charge] - No VAT
1. Underpinning Charges
Basis of Charge | Plan Charge | VAT | Total | Inspection Charge | VAT | Total |
Single lift (per 5m or part thereof) |
£242 |
£48.40 |
£290.40 |
£272 |
£54.40 |
£326.40 |
Each additional 5m or part thereof |
£242 |
£48.40 |
£290.40 |
£117 |
£23.40 |
£140.40 |
2. Fit Out and Alteration – Office and Retail
Estimated cost less than £2,000
Charge Type | Charge | VAT | Total |
Plan Charge |
£233 |
£46.60 |
£279.60 |
Inspection Charge |
£265 |
£53.00 |
£318.00 |
Estimated cost £2,000 - £4,999
Charge Type | Charge | VAT | Total |
Plan Charge |
£305 |
£61.00 |
£366.00 |
Inspection Charge |
£419 |
£83.80 |
£502.80 |
Estimated cost £5,000 - £19,999
Charge Type | Charge | VAT | Total |
Plan Charge |
£378 |
£75.60 |
£453.60 |
Inspection Charge |
£572 |
£114.40 |
£686.40 |
Estimated cost £20,000 - £49,999
Charge Type | Charge | VAT | Total |
Plan Charge |
£450 |
£90.00 |
£540.00 |
Inspection Charge |
£726 |
£145.20 |
£871.20 |
Estimated cost £50,000 - £99,999
Charge Type | Charge | VAT | Total |
Plan Charge |
£522 |
£104.40 |
£626.40 |
Inspection Charge |
£880 |
£176.00 |
£1056.00 |
Estimated cost £100,000 - £249,999
Charge Type | Charge | VAT | Total |
Plan Charge (£100,000 - £150,000) |
£594 |
£118.80 |
£712.80 |
Inspection Charge (£100,000 - £150,000) |
£1033 |
£206.60 |
£1239.60 |
Plan Charge (£150,000 - £250,000) |
£667 |
£133.40 |
£800.40 |
Inspection Charge (£150,000 - £250,000) |
£1187 |
£237.40 |
£1424.40 |
3. Fit Out and Alteration – Other Uses
Estimated cost less than £2,000
Charge Type | Charge | VAT | Total |
Plan Charge |
£233 |
£46.60 |
£279.60 |
Inspection Charge |
£451 |
£90.20 |
£541.20 |
Estimated cost £2,000 - £4,999
Charge Type | Charge | VAT | Total |
Plan Charge |
£305 |
£61.00 |
£366.00 |
Inspection Charge |
£654 |
£130.80 |
£784.80 |
Estimated cost £5,000 - £19,999
Charge Type | Charge | VAT | Total |
Plan Charge |
£378 |
£75.60 |
£453.60 |
Inspection Charge |
£856 |
£171.20 |
£1027.20 |
Estimated cost £20,000 - £49,999
Charge Type | Charge | VAT | Total |
Plan Charge |
£450 |
£90.00 |
£540.00 |
Inspection Charge |
£1059 |
£211.80 |
£1270.80 |
Estimated cost £50,000 - £99,999
Charge Type | Charge | VAT | Total |
Plan Charge |
£522 |
£104.40 |
£626.40 |
Inspection Charge |
£1262 |
£252.40 |
£1514.40 |
Demolition Notice Charge
Section 10(3) of the London Local Authorities Act 2004 provides for the recovery of reasonably incurred expenses from a person on whom a notice is served under Section 81 of the Act of 1984. This charge covers officer time and administrative costs associated with surveying, consultation, and issuing the notice.
Section 30 (Temporary Structure) Charges (£) - VAT does not apply
Structure Type | Charge (£) |
Grandstand (10-250 seats) |
£398 |
Grandstand (251-600 seats) |
£595 |
Grandstand (601-1000 seats) |
£792 |
Stage (<60m²) |
£413 |
Framed Tower (loudspeakers, lights, etc.) |
£249 (+50% for each additional tower) |
Renewal of Previous Consents
Structure Type | Charge (£) |
Building or structure <20m² |
* |
Building or structure <40m² |
* |
Building or structure <250m² |
* |
Building or structure >250m² |
* |
7. Advertisement Hoarding & Other Structures
Structure Type | Charge (£) |
Chimney Shaft, Smoke Duct, Tower (first 6m) |
* |
Every additional 6m (or part thereof) |
* |
Independent advertisement hoarding panel |
* |
# The length of the shaft or structure shall be measured independently of the height of the sub- structure
*To be agreed based on details of structure Please contact us for a fee quote
You can use the below links to go to the relevant section:
Standard Charges for the Creation of New Dwellings
Domestic Extensions and Alterations
Building control charges homepage