Technical specifications for Malmesbury School

The key innovative and low impact design features of the building

  • BasicBuildingcost - £/m2   This information can be released once the tender returns have been received.
  • Services costs - £/m2 This information can be released once the tender returns have been received.
  • External works - £/m2 This information can be released once the tender returns have been received.
  • Gross floor area - 264m2
  • Total area of site - 0.54hectares
  • Function areas and their size -
  • Multipurpose Room - 18m2
  • Parents Room - 31m2
  • Extended School Use Room - 31m2
  • Areas of circulation -  59m2
  • Areas of storage -  0m2
  • Percentage area of grounds to be used by the community - 0%
  • Percentage area of building to be used by the community -  1.3%
  • Steps taken during construction process to reduce environmental impacts (innovative construction management techniques) This will be added by the contractor once they have been appointed.
  • A list of any social or economically sustainable measures achieved - Considerate Constructors, Energy efficient boiler, green roof with camera, new windows are being installed and walls and floors have been specified to exceed the requirements of the new Part L 2010 building regulations.
  • Predicted electricity consumption -  kWh/m2
  • Predicted fossil fuels consumption - kWh/m2
  • Predicted renewable energy generation - 0 kWh/m2
  • Predicted water use - m3/person/year